GMP washer control system retrofit
The buyer's problem
Legacy washer controls can make batch sequencing, audit-ready reporting and data backup harder to maintain. Replacing the automation should not erase established cleaning cycles or operator practice.
What we replace
- Obsolete PLC and HMI hardware with a current control and visualization architecture.
- Aging batch reporting and data-management components with agreed backup and redundancy provisions.
- Legacy sequence control that cannot support required auto/manual operating workflows.
What we retain where suitable
- The washer chamber, utility connections and serviceable mechanical systems.
- Approved cleaning recipes, cycle steps, limits and operating know-how.
- Plant historian, site network or reporting connections where compatibility and data governance permit.
Control platforms
- Siemens and Rockwell platforms, with customized visualization software (documented in the matching GMP washing machine case study).
Validation deliverables: FAT through PQ
Deliverables and responsibilities are agreed with your engineering and quality teams. PQ approval remains with the equipment owner.
- Pre-FAT / FAT: approved sequence, auto/manual, report and backup test protocols with execution records and deviations.
- SAT: installation and site-interface acceptance report against agreed washer requirements.
- IQ / OQ: installation checklists, functional test records, access/electronic-record evidence where applicable and requirements traceability.
- PQ: technical support for customer-approved cleaning-performance protocols, run records and training handover; cleaning acceptance remains with customer QA.
Matching project experience
The case study reports redundant batch report generation, tamperproof PDF reporting, auto/manual sequence options and a fastest handover of 15 days.