
Case Study
Imported Filtration Systems Retrofit
Modernizing controls for a legacy imported filtration system to support electronic records, audit readiness and reliable operation. This project is an adjacent filtration example; suitability for a particular filtration process requires engineering review.
The Challenge
- ObsolescenceCritical requirement to upgrade a legacy foreign-make filtration control system.
- Compliance MandateMeeting strict 21CFR Part 11/Annex 11 guidelines and ERES/CSV standards.
- Process RequirementDemanding, exhaustive documentation required for every system component and lifecycle phase.
Our Solution
- Platform UpgradeReplaced legacy controls with robust Rockwell Automation hardware and integrated standalone visualization software.
- Compliance EngineImplemented Batch Process Management using LBSM SCADA software with standardized programming.
- Total ValidationExecuted a full-cycle validation process: FAT (GM Controls Factory), SAT, IQ, OQ, Training, and PQ.
Performance Achieved
- Compliance & QualityFull critical 21CFR Part 11/Annex 11 Compliance Achieved, Increased Data Integrity
- Validation SuccessMet ERES/CSV requirements with Minimum Deviation, increased Audit Readiness
- Enhanced Process VisibilityStandardized HMI Design Reduced operator errors and Improved Batch monitoring
2REPEAT JOBS
20 DAYSFASTEST HANDOVER
COMPLIANCEFull critical 21CFR Part 11/Annex 11 Achieved
★ Full critical 21CFR Part 11/Annex 11 Achieved ★
Read Next Stories

Production Fermenter Control Systems
Upgrade requirements for aging, foreign-make Fermenter control systems with critical 21CFR Part 11/Annex 11 compliance.
Read Story

GMP Washing Machines Retrofit
Retrofitting foreign-make GMP Washing Machines with modern control platforms for 21CFR Part 11/Annex 11 compliance and enhanced data integrity.
Read Story